What is WFE?
The Workforce Enablement, WFE is a metric used to gauge adoption by measuring your scheduling utilization.
How is it Calculated?
WFE is the % of schedules for a historic period. It is reflective of the % of scheduled events (assignments or leaves) that are not labeled “No Schedule Days” or “Special”.
Scheduled events include Assignments, RDOs, Flex Days, Lay Off, Special, Idle, Pre-Shift Meeting, Leave, and No Schedule Days. These are the values that are found in the “Type” field within the Employee Assignments Report.
Required Configurations
Schedules and Base Schedule:
Must include RDO (Regular Days Off)
Holidays:
Holidays are a visual indicator on the Roster. If your site does not operate on a holiday it is recommended to use an RDO or Leave in addition to the Holiday indicator.