Configuring Demand Preferences
1. Click on the Administration icon from the navigation menu, then select the Preferences Administration option in the Settings section.
2. Click Demand Planning and then Demand Planning Displayed Dimension.
3. Select the desired scope for the Demand Planning Displayed Dimension from the Scope drop-down.
Note: Setting the Scope to Domain makes the Demand Planning Displayed Dimension
available across all organizational units.
4. From the drop-down menu, select Job.
Note: Selecting Job from the drop-down will allow the user to create demands
on the different jobs.
5. Press the Save button.
Create a New Demand
1. Click on the Scheduling icon from the navigation menu, then select the Demand Planning option in the Demands section.
2. Click on the Job and Date that you wish you create a new Demand for.
Note: Depending on where the user clicks within a date, a suggested shift
based on the time of day will be populated.
3. From the Labor Demand Template drop-down, select the Labor Demand Template that is demanded.
4. Select the From Shift and To Shift from the respective drop-downs.
Note: To set more precise Start/End Time click on the double arrow icon .
Indeavor Protip: Make sure the From Shift and the To Shift always match.
For example: if you have 1st shift-Wed in the From, you will need to
put 1st shift-Wed in the To.
5. From the Location drop-down, select the desired Location.
6. From the Demand Category drop-down, select the desired Demand Category.
7. Press the Demand button.
Create a New Demand with Recurrence
1. Click on the Scheduling icon from the navigation menu, then select the Demand Planning option in the Demands section.
2. Click on the Job and Date that you wish you create a new Demand for.
3. From the Labor Demand Template drop-down, select the Labor Demand Template that is demanded.
4. Select the From Shift and To Shift from the respective drop-downs.
Note: To set more precise Start/End Time click on the double arrow icon .
Indeavor Protip: Make sure the From Shift and the To Shift always match.
For example: if you have 1st shift-Wed in the From, you will need to
put 1st shift-Wed in the To.
5. From the Location drop-down, select the desired Location.
6. From the Demand Category drop-down, select the desired Demand Category.
7. From the Repeat drop-down, select Yes to repeat the demand.
8. From the Recur drop-down, select the desired recurrence pattern: daily or weekly.
9. Use the up and down arrows to adjust how often the demand recurs (in days or weeks).
10. Enter an End Date and Time or leave the field blank to repeat the demand indefinitely.
11. Press the Demand button.
Create a New Ad-Hoc Demand
1. Click on the Scheduling icon from the navigation menu, then select the Demand Planning option in the Demands section.
2. Click on the Job and Date that you wish you create a new Demand for.
Note: The Ad-Hoc screen should show up with the Job that you clicked on already
entered into the drop-down menu.
3. Press the Plus button to add a new Job
4. Select a Job from the drop-down and use the up and down arrows to adjust the Optimum Count.
Note: To indicate Minimum/Maximum Count, click on the double arrow icon
5. Repeat steps 4-5 to add more jobs.
6. Select the From Shift and To Shift from the respective drop-downs.
Note: To set more precise Start/End Time click on the double arrow icon .
Indeavor Protip: Make sure the From Shift and the To Shift always match.
For example: if you have 1st shift-Wed in the From, you will need to
put 1st shift-Wed in the To.
7. From the Location drop-down, select the desired Location.
8. From the Demand Category drop-down, select the desired Demand Category.
9. Press the Demand button.